After all the electrical stuff i had, i begin with the box to place the circuit for Kwh meter.
then i place the distribution box next to the KwH box
Wiring the connection for Main switch, Earth leakage circuit breaker, and Main circuit breaker. After done the wiring, do the continuity test again to check all the connection is good.
Drilling hole for fitting the bulb, switch and socket.
Fitting the bulb wire
Finalize the Hardware development .