flow chart





this is the flow chart of my project. i begin with the literature review on hardware first then go to the literature review on software. Next i decide on design system. If got any problem, i get back study on design system if there is no problem with that, i start with programming the PIC then hardware building on TNB meter reading. Once done lab test will conduct to get the result.Result will show the next step.If every things good proceed with the circuit combination and project testing until the project achieved.