Wednesday, April 11, 2012

Objective of this project

This research study intends to plug the research gap and will demonstrate the development of the techniques to estimate the new way of knowing the electricity usage in real time.

  • a) The development of new measuring methods by considering the connection output from static meter.
  • b) The application of the proposed new methods to determine the appropriate currency conversion types for particular applications from the output.
  • c) The application of the proposed reliability new methods to identify the best design configuration in terms of the system’s reliability and availability.
  • d) Validating the system’s reliability parameters obtained from the proposed new methods by considering the results in Ringgit Malaysia currency.

No comments:

Post a Comment